ARK-E1021 - Studio Spring, Emergent Design Methodologies, Lecture, 12.1.2024-12.4.2024
This course space end date is set to 12.04.2024 Search Courses: ARK-E1021
Room Programme
Use: Multi-tenant flexible adaptive reuse
- users both from vicinity and elsewhere: for tourists and locals
- includes both loose fit, low-cost spaces more expensive parts
Including:
Hotel and accommodation (not residential) 2tm2
Budget boutique hotel 2tm2
Event space 2tm2
Concert / party / meeting venue 1,5tm2
Supporting spaces 0,5tm2
Creative industries 2tm2
Offices, ateliers, and workshops for the creative industry 2tm2
Other office spaces 2tm2
Culture, visual and performing arts 11-14tm2
Centre of the Visual Arts (Kuvataiteen talo) 3-4tm2
• Exhibition spaces (1tm2)
• Project spaces, different sizes (500m2)
• Public workshop spaces (500m2)
• Shared use workshops with technique for artists (500m2)
• Residence activities (300m2)
• Retail for artists (incl. framing, art books, law services (200m2)
Helsinki Art Museum 11tm2
• Exhibition spaces (4tm2)
• Public workshopping spaces + auditorium + event and meeting spaces near the main lobby (1000m2)
• Offices, staff's service spaces and breakrooms (900m2)
• Facilities for the staff in the background (handling artworks, conservation, storage, 1,1tm2)
• Exhibition construction (loading, workshops 800m2)
• Retail connected to the lobby (500m2)
• Lobby spaces (1000m2)
• Restaurant (500m2)
• Building techniques (HVAC etc. 1,5tm2)
Retail, food and beverage 2tm2
Sport 3tm2
Circular society recycling hub 2,5tm2
Entrance & administration 200m2
Customer drop-off area incl. containers 500m2
Storage & baling 500m2
Hazardous material storage 100m2
Education/visitor centre 150m2
Composting 150m2
Pop-up space for sharing local services (catering, haircutting etc.) 300m2
Community greenhouse 200m2
Recycling area for household goods 200m2
Recycling area for clothes 200m2
Community 3tm2
Kindergarten 2tm2
Library 1tm2
tot. 25-30tm2 (of which floor areal 15-18fl-m2)
+ car parking 1pp/130fl-m2 (115-138 pp, spatial requirement app. 12,5m2/car) = 1,5t-2tm2
+ common spaces app. 6tm2
• building-level common lobbies, circulation etc. to the spaces above
All tot. app. 30-40tm2
Design instructions
Starting point:
Power Plant app. 35tm2 + the personnel service building 5tm2 + Machine Works building app. 15tm2
Tot. app. 55tm2
Buildings doomed to be demolished / dismantled:
- Machine Works (Konepaja); made completely of prefab elements, app. 15tm2
- Transformer Halls (B) app. 3tm2
- Sulphur Extraction Facility (M) app. 1000m2
- Wet waste storage (N) app. 200m2
- Suphur Processing (O) app. 500m2
tot. app. 20tm2
remains app. 35tm2, part of which can be demolished/dismantled
Approximate target:
It is important to understand that your design in the end must be app. 30-40tm2 and include include ⅓ interior refurbishment, ⅓ new floor construction within existing buildings, and ⅓ totally new building parts, thus app.:
- reused existing spaces 10tm2
- new floors within existing building envelopes 5tm2
- new construction at lest partially made of recycled building and moved parts from the site 5tm2
- purely new construction 20m2
Cutting concrete with diamond saws and wires have become commonplace technique. Please see for example this informative video:
:
Outdoor areas: These need to be designed to the site
- Outdoor terminal for Vantaa buses
- Skateboarding park
- Spaces for Flow Festival