Week 35-36

Sept 8

Project team formation and pre-questionnaire

Week 37

Sept 15

Design brief for group project 

Week 37-39

Sept 27-29

Stirling engine starter project (individual work)

Week 40

Oct 6

Initial concept for group project

Week 43

Oct 27

Concept pitch + peer review & 1st evaluation questionnaire

Week 46

Nov 17

Status report & 2nd evaluation questionnaire

Week 47

 

Status report peer review 

Week 48

Nov 29

Information poster

Week 48

Dec 1

Gala: Prototype demonstration & Demonstration gala reflections

Week 50

Dec 15

Final report & Final evaluation questionnaire



Weeks 37-39

- Individually measure components of Stirling engine

- Select best ideas together as a group

- Operate engine in the lab and measure engine operation (Sept 27 or 29)

Already during weeks 37-39

- Initial ideation for your machine design project i.e., about functions, mechanism, its manufacturability etc.

- Select best ideas together as a group

Weeks 40-43: Develop concept and initial design

- Confirm concept to be developed (Oct 6)

- Decide components, materials (Granta Edupack), verify functionality (models, MBS), FEA (in critical places) and necessary steps of product design

- First draft of design documentation and manufacturing/ assembly plan

Week 43: Concept pitch in lieu of midterm exam (Oct 27)

- Pitch the concept, design process, material selection, manufacturing plan, assembly plan and other aspects (more details via announcement)

- Student groups are allowed to playback a pre-recorded concept pitch

- Peer review: Pre-determined groups will critique the concept pitches

- In case you have a time/order preference for the pitching session, please inform the course assistant beforehand

- Submit the 1st evaluation questionnaire (Oct 27)

Weeks 44-46: Detailed design & kickstart prototype development

- Iterate and further develop the machine concept design

- Update design documentation based on the detailed design

- Start updating and elaborating the manufacturing/ assembly plan & do a safety evaluation

- Project status report is a work-in-progress (draft) version of your final report (by Nov 17).
Include the progress/current status, schedule, work distribution, design documentation, draft versions of manufacturing, assembly and testing plans

- Submit the 2nd evaluation questionnaire (Nov 17)

Weeks 47-50: Exhibiting the prototype

- Status report peer review  (week 47)

- Iterate prototype, finalize design documentation

- Advertising your project (poster for Gala by Nov 29)

- Gala presentation on Dec 1

- Complete demonstration gala reflections by midnight the day of the Gala

Week 51: Final reporting and Final evaluation questionnaire (by Dec 15)

Viimeksi muutettu: maanantaina 28. elokuuta 2023, 15.55